Linkedin
  • How It Works
    • Which Level Do You Need?
    • Platform Templates
    • Our Process
    • Demo & Video
  • Pricing
    • All Packages
    • Guided Documentation (New)
    • Free Assessment Tool
  • CMMC Books
  • Blog
  • FAQ
  • About Us
  • Free Consultation
Menu Categories
  • How It Works
    • Which Level Do You Need?
    • Platform Templates
    • Our Process
    • Demo & Video
  • Pricing
    • All Packages
    • Guided Documentation (New)
    • Free Assessment Tool
  • CMMC Books
  • Blog
  • FAQ
  • About Us
  • Free Consultation
Linkedin
Cart To use Cart please install WooCommerce plugin
Field Notes · Part 2 of 6

Field Notes: Machine Shops Don't Stall on the Machines. They Stall on the Thumb Drive.

Most shop-floor CMMC projects stall trying to secure every machine. The work that matters is where the file goes.

By Rob Maupin, Overwatch Tools · Author of the CMMC Practical Guides series

Published November 3, 2026. This article reflects the requirements in force at the time of writing, including FAR 52.204-21, DFARS 252.204-7012, NIST SP 800-171, the DoD CIO CMMC Scoping Guides, and Phase 1 CMMC self-assessment requirements. Guidance may change, and we will update this article as it does.

Field Profile

IndustryCNC machining and light fabrication
Size20–35 people: an office of about five, the rest on the floor
Work mixCommercial and defense subcontract parts
Who does ITThe shop manager, between production meetings
On the floorCNC machines, a coordinate measuring machine, and an older PC that runs a machine controller
The call came fromA prime's supplier questionnaire asking how the shop handles technical data

Composite drawn from the kinds of machine shops and fabricators I work with. It is not a single client, and the details are illustrative.

Where it stalls · Week three

A spreadsheet lists every machine on the floor, and the shop manager is trying to figure out how a CNC controller meets 110 requirements. Meanwhile the technical data package still rides from the office PC to the controller on a thumb drive, and nobody has written down where it goes after that.

Who's stuck: the shop manager, who is also the IT person and the production person.

Where Machine Shops Actually Stall

Here's how it usually goes. A prime's supplier questionnaire asks how the shop handles technical data. The shop manager does what any good manufacturing person does first: inventories the equipment.

By week three every machine has a row, and every row has a question mark next to "access control" and "audit logging." Some of those machines run software that can't be updated at all. Meanwhile the one thing that actually moves the technical data around the building, a thumb drive between the office PC and the controller, isn't on the spreadsheet.

In my experience, this is one of the most common ways a shop-floor CMMC project stalls. It isn't a failure; it's a reasonable instinct pointed at the wrong end of the building. Here's why.

1. They're trying to secure equipment the scoping guide treats differently

The DoD CIO's CMMC Scoping Guides have a category for exactly this kind of equipment: Specialized Assets. The named types include Operational Technology, Industrial Internet of Things devices, Government Furnished Equipment, Restricted Information Systems, and Test Equipment. Plenty of shop-floor equipment can fit. How you categorize each asset is your decision, and your documentation should say why.

What the scoping guides actually say

Level 1: "Specialized Assets are not part of the Level 1 self-assessment scope and are not assessed against CMMC requirements." (CMMC Scoping Guide, Level 1, v2.13)

Level 2: Specialized Assets are those that "can process, store, or transmit CUI but are unable to be fully secured." They are documented in the asset inventory, documented in the System Security Plan (SSP) as managed under your risk-based security policies, procedures, and practices, and documented in the network diagram of the assessment scope. They are not assessed against other CMMC security requirements. (CMMC Scoping Guide, Level 2)

The Level 2 part cuts both ways. Specialized Assets aren't ignored: they're in the inventory, the SSP, and the diagram, and you have to show how they're managed. What the guide doesn't ask is for a CNC controller to meet the same requirements as an office laptop.

Notice what isn't on that list: the office PC that opens the file and the thumb drive that carries it. Those are ordinary IT, and if they handle the information, the normal requirements apply.

2. The file path is the real scoping decision

Scope follows information, not equipment. At Level 1, assets in scope process, store, or transmit Federal Contract Information (FCI); at Level 2, Controlled Unclassified Information (CUI). So the deciding question isn't "how many machines do we have?" It's "where does the technical data package go?"

Where does it land, what does it touch while the part is made, and where is it stored after the job ships? Until that path is written down, the spreadsheet can't tell you which rows matter.

3. The shop manager is running production too

In a 20–35 person shop, CMMC lands on the shop manager, who also schedules the floor, chases late material, and gets the call when a spindle goes down at 6 a.m. The schedule wins every day, and it should.

It's the same pattern behind why Level 2 stalls on documentation, not the technology: the work isn't beyond anyone in the shop, it just never gets protected time.

4. Nobody owns the front door

Technical data reaches a shop by many routes: the prime's portal, an email to whoever quoted the job, a link to the shop manager. If nobody is named as the receiver and nobody has said what the data arrives on, every route stays open, and every download "just to take a look" widens the path you'll document later.

Why Now

Phase 1 CMMC requirements have been in force since November 10, 2025: self-assessments at Level 1, and at Level 2 where a contract calls for it. For most shops the first sign isn't a clause; it's a questionnaire like this one. That question is lead time. A path you've mapped now is easier than one reconstructed after an award.

Where the FCI Lives: The Whole Shop Is Level 1

Most of a machine shop's defense paperwork is FCI: purchase orders, the subcontract, schedules, quotes, packing slips, and correspondence with the prime's buyer. It lives mostly in the office, though travelers and work orders on the floor can carry it too.

That's CMMC Level 1: 15 practices, each scored MET or NOT MET, an annual affirmation, and a system description. No numeric score, no POAM, and no SSP required (the Level 1 scoping guide recommends one as a best practice, but doesn't require it). For a shop like this one, a solid Level 1 looks like this:

  • Everyone in the office has their own account, and the shared login on the office PC goes away
  • Multi-factor sign-in on email and the cloud file service
  • Office computers, including the one that talks to the floor, patched and protected against malware
  • Visitors and delivery drivers escorted and logged, and physical access limited to the people who need it
  • Old hard drives, thumb drives, and retired PCs sanitized before they're reused or thrown out

The surprise for owners bracing to secure every machine: Specialized Assets aren't part of Level 1 scope. I walk through Level 1 scoping and all 15 practices in plain English in CMMC Practical Guides, Volume 1: CMMC Level 1. To see where you stand today, the free CMMC Assessment Tool gives you a Level 1 gap list in under 30 minutes.

Whether CUI Shows Up, and Where

For a machine shop, the CUI question lives in the technical data package. DFARS 252.204-7012 defines controlled technical information as part of covered defense information: technical information with military or space application that's subject to controls on who can access, use, reproduce, or release it. Drawings and specifications for defense parts are where it tends to show up.

The definition isn't a determination.

I don't decide what's CUI, and neither does this article. If the technical data is marked, your contract and the marking tell you what applies. If something arrives unmarked and you're unsure, the question goes to your prime or your contracting officer, in writing.

If marked technical data is coming in, the shop needs a Level 2 answer for that data, not for the whole shop.

The Right-Sized Build: Level 1 Everywhere, an Enclave for the Technical Data

The office side of this build is in Building a Level 2 CUI Enclave, Start to Signature. This post is about the floor, so here's the build in three lines:

  • Level 1 across the shop. Office systems, email, the shared folder, and the people who handle FCI, all under the 15 practices.
  • A small Level 2 enclave where marked technical data is received, reviewed, and stored, used by the few people who actually handle it.
  • The floor, documented honestly. Equipment that the data reaches and that can't be fully secured goes in the inventory, the SSP, and the network diagram, managed under written risk-based policies.

Under 32 CFR 170.19, assets physically or logically separated from CUI assets are outside Level 2 scope, though they still carry Level 1 obligations if they handle FCI. The full case for keeping Level 2 small is in Your Whole Office Doesn't Need to Be Level 2.

Level 2 sits on top of Level 1. That's a fact about your obligations, not a sales sequence: the shop still owes Level 1 for its FCI, and the enclave adds the 110 NIST SP 800-171 requirements for the CUI. The enclave can live on either platform:

Google Workspace

A dedicated Google Workspace environment for the enclave users, configured from our enclave guides. Technical data lives there; everyday systems stay outside it.

Fits shops that already run on Google and want a lighter administrative footprint.

Microsoft 365 GCC High

A separate GCC High environment for the enclave users only. Their CUI email and file storage happen there; the rest of the shop stays where it is.

Fits shops whose office already works in Microsoft every day.

Neither is the default; it depends on what your team knows, how your prime sends data, and what your contract requires.

⚠️ Self-Assessment Programs Only. The L2 CUI Enclave Package is scoped for CMMC Level 2 programs eligible for annual self-assessment. Programs required to use a C3PAO are not in scope.

What Unsticks It: Map the File Before You Touch a Machine

Put the machine spreadsheet down for a day. Pick one recent defense job and trace its technical data package through four stops.

1

Receive

Who gets it from the prime, and on what?
2

Work

Which computer opens it? How does the program reach the controller, and what does the controller keep?
3

Store

Where does the file live while the job is running?
4

Archive

Where does it go when the job ships, and who can still get to it?

How it drifts

  1. Emailed to whoever quoted the job
  2. Downloaded to the office PC "to take a look"
  3. Saved in the shared jobs folder, which syncs and gets backed up
  4. Copied to whichever thumb drive is handy and walked to the controller
  5. Left on the drive and the controller after the job ships, with none of it written down

Where it should go

  1. Arrives at one named receiver, in the enclave
  2. Reviewed only on CUI-only enclave devices
  3. The move to the floor is a written, owned step: a known drive, a known person
  4. Stored in the enclave, then archived or removed on a set schedule when the job ships
  5. The floor equipment it reaches is in the inventory, the SSP, and the network diagram

Your network diagram shows where these assets sit. How your shop is wired depends on your machines, and that's a conversation for the call, not a blog post.

Document the floor; don't try to harden it

Once the path is on paper, most rows on the spreadsheet answer one question: does the file actually reach this asset?

AssetWhat it does with the fileHow it's handled
Office PC that opens the packageProcesses and stores itInside the enclave, or kept away from marked data. Ordinary IT requirements apply.
The thumb driveTransmits and stores itOwned, controlled media. NIST SP 800-171 bars portable storage with no identifiable owner.
The older controller PCReceives the program and may keep itIf it handles CUI and can't be fully secured, a candidate Specialized Asset: inventory, SSP, network diagram, risk-based policies.
CNC machines and the measuring machineDepends on how the program and data reach themThe same question, answered and written down for each one.
Travelers and work orders on the floorCarry FCI on paperLevel 1: physical protection and proper disposal.

Stuck at the machine spreadsheet? We'll find the way through in 30 minutes.

Bring one job's file path, from the prime to the archive. We'll show you which rows on your spreadsheet matter and where your enclave line should sit.

Map My Shop's File Path →

If writing time is the bottleneck

Mapping the path unsticks the scope. It doesn't write the documentation, which is often the next stall. That's why I offer the L2 CUI Enclave — Guided Documentation tier. What stays the same: the 110 practices, the 182-artifact set, your consulting sessions, and your signature on the affirmation. What changes: the drafting. Three roles: you answer structured questions about the enclave you built, we review the draft against your configuration, and you sign.

The tool runs outside your CUI boundary. No connection to your tenant, no access to your systems, and it never touches CUI. Its only inputs are your answers about how your environment is set up. It produces documentation about the enclave. It never operates inside it.

Fit: it works on an enclave that's configured or being configured; if yours isn't, configure first, then go guided. More in Same Practices, Same Artifacts, Same Signature.

In most cases, clients on the guided path complete their Level 2 enclave self-assessment in about 30 days. Timing varies with how far along your configuration is, your platform, and how quickly your team answers the intake.

Our Analysis — not a commitment.

What I'd Do This Month

None of these steps requires buying anything.

1

Read the contract and the markings

Look for DFARS 252.204-7012 in your subcontract and check how incoming technical data is marked. Ask your prime in writing if it's unclear.

2

Trace one job's file path

Receive, work, store, archive. Every inbox, computer, drive, and machine it touched is your real scope picture.

3

Name the front door

Pick one person to receive technical data, decide what it arrives on, and tell the prime.

4

Shorten the spreadsheet

Next to each machine, answer one question: does the file reach it? The "no" rows leave the Level 2 conversation.

5

Check your Level 1 baseline

Everything else sits on top of it. The free assessment tool shows your Level 1 gaps in under 30 minutes.

What It Costs

The L1 Turnkey Package is $2,495/year (limited time, save $500 off the regular $2,995): 15 practices mapped to 142 artifacts, Google Workspace or Microsoft 365 templates, 8 configuration guides, the Evidence Locker, and 8 bi-weekly sessions. Most clients complete their Level 1 assessment in 2–4 weeks; timing varies with your setup and pace (Our Analysis — not a commitment). The L2 CUI Enclave Package is $3,495/year: 110 practices mapped to 182 artifacts, Google Workspace or Microsoft 365 GCC High enclave guides, a pre-filled SSP, POAM framework, and Risk Register, with no enterprise IT required. Both together are $5,990/year; Guided Documentation is its own tier at $5,495/year. We provide templates, guides, and consulting; you implement and buy your own CUI-only devices.

⚠️ Self-Assessment Programs Only. The L2 CUI Enclave Package is scoped for CMMC Level 2 programs eligible for annual self-assessment. Programs required to use a C3PAO are not in scope.

Prefer to Do It Yourself?

The CMMC Practical Guides series covers both levels for small and medium contractors. Kindle editions from $12.99.

Cover of CMMC Practical Guides Volume 1: CMMC Level 1 by Rob Maupin

Volume 1: CMMC Level 1

The 15 practices, in plain English. View Volume 1 on Amazon

Cover of CMMC Practical Guides Volume 2: CMMC Level 2 by Rob Maupin

Volume 2: CMMC Level 2

The 110 requirements, for a right-sized environment. View Volume 2 on Amazon

What I'd Tell the Next Machine Shop

Your CMMC scope isn't decided by how many machines you own. It's decided by your contract, the markings on the technical data, and where you let it go. Give it one front door, a small enclave, and a written path to the floor, and the machines become rows you document instead of a project you can't finish.

Follow the file first. The floor makes sense after that.

Ready to see the questions?

A free 30-minute consultation covers your file path, your platform choice, and whether the standard package or the guided tier fits your shop.

Book My Free 30-Minute Call →

Next in Field Notes, Part 3: why software shops stall on a signature, not a tool.

Rob Maupin is co-founder of Overwatch Tools and author of the CMMC Practical Guides series: Volume 1: CMMC Level 1 and Volume 2: CMMC Level 2. He helps small and medium defense contractors build self-assessments they can defend.

Rob offers the L2 CUI Enclave — Guided Documentation tier for qualifying self-assessment programs.

Sources

  • CMMC Scoping Guide, Level 1, v2.13 (DoD CIO) (Specialized Assets at Level 1)
  • CMMC Scoping Guide, Level 2 (DoD CIO) (Specialized Assets at Level 2)
  • 32 CFR 170.19, CMMC Scoping
  • DFARS 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting (definition of controlled technical information)
  • FAR 52.204-21, Basic Safeguarding of Covered Contractor Information Systems
  • NIST SP 800-171 Rev. 2
  • NARA CUI Registry, Category List

This article is general information, not legal advice. Whether your contracts require a Level 2 self-assessment, and whether information you hold is CUI, is determined by your contract and your contracting officer or prime. Questions of contract interpretation should go to your attorney.

Tags: cmmc, FCI_vs_CUI, Google, L2, Level 2, MS365, NIST, templates
Share Post
  • Twitter
  • Facebook
  • Pinterest
  • Linkedin
Field Notes: The Engineering F...
Field Notes: The Engineering Firm Whose CUI Lives in a CAD File
Field Notes: The Software Shop With a Great MSP and an Unsigned Affirmation
Field Notes: The Software Shop...

Related posts

RC1Blog
Read more

Industry Answered the Department’s Seven Questions. The Assessment Wasn’t the Expensive Part.

The Real Cost · Part 1 of 8 Industry Answered the Department’s Seven Questions. The Assessment Wasn’t the Expensive Part. Most contractors price the assessment. The money goes into everything before it. By Rob Maupin, Overwatch Tools · Author of the CMMC Practical Guides series Published November 23, 2026. As of today, CMMC Phase II remains suspended... Continue reading
Field Notes: The All-Cloud Firm That Stalled on Default Settings
Read more

Field Notes: The All-Cloud Firm That Stalled on Default Settings

Field Notes · Part 6 of 6 Field Notes: The All-Cloud Firm That Stalled on Default Settings Most all-cloud firms don’t stall on the subscription. They stall on the configuration. By Rob Maupin, Overwatch Tools · Author of the CMMC Practical Guides series Published November 20, 2026. This article reflects the requirements in force at the time... Continue reading
Field Notes: The Logistics Company That Stalled at One Shared Inbox
Read more

Field Notes: The Logistics Company That Stalled at One Shared Inbox

Field Notes · Part 5 of 6 Field Notes: The Logistics Company That Stalled at One Shared Inbox Most logistics firms don’t stall on the trucks. They stall on where one document goes. By Rob Maupin, Overwatch Tools · Author of the CMMC Practical Guides series Published November 16, 2026. This article reflects the requirements in force... Continue reading
Field Notes: Construction Subs Don't Stall in the Office. They Stall on the Crew's Phones.
Read more

Field Notes: Construction Subs Don’t Stall in the Office. They Stall on the Crew’s Phones.

Field Notes · Part 4 of 6 Field Notes: Construction Subs Don’t Stall in the Office. They Stall on the Crew’s Phones. Most construction subcontractors stall on Level 1 in the field, not at the desk. By Rob Maupin, Overwatch Tools · Author of the CMMC Practical Guides series Published November 12, 2026. This article reflects the... Continue reading
Field Notes: The Software Shop With a Great MSP and an Unsigned Affirmation
Read more

Field Notes: The Software Shop With a Great MSP and an Unsigned Affirmation

Field Notes · Part 3 of 6 Field Notes: The Software Shop With a Great MSP and an Unsigned Affirmation Most software shops don’t stall on tooling. They stall on who owns the scope. By Rob Maupin, Overwatch Tools · Author of the CMMC Practical Guides series Published November 10, 2026. This article reflects the requirements in... Continue reading

Comments are closed

Company Address

  • Overwatch Tools, Inc.
  • 300 Woodards Ford Road
  • Chesapeake Virginia 23322
  • E-Mail: info@overwatchtools.com
  • Outervision Capitol Company
  • Privacy Policy

,Copyright © 2025 Overwatch Tools, Inc.

Home
Shop
Contact us
More
More
  • How It Works
    • Which Level Do You Need?
    • Platform Templates
    • Our Process
    • Demo & Video
  • Pricing
    • All Packages
    • Guided Documentation (New)
    • Free Assessment Tool
  • CMMC Books
  • Blog
  • FAQ
  • About Us
  • Free Consultation